Commercial Conduit Fill Calculator

Calculate conduit fill for commercial building electrical systems with our free, NEC-compliant calculator. This tool is designed for commercial applications including lighting circuits, three-phase power distribution, HVAC systems, and larger load requirements typical in commercial buildings.

Whether you're installing lighting controls, power distribution for office equipment, three-phase motors, or electrical service for retail spaces, our calculator ensures your commercial conduit installations meet all National Electrical Code requirements for safe and compliant building wiring.

Input Parameters

Conductors

Results

Enter conduit and wire information to see results

NEC Fill Requirements

According to NEC Chapter 9, Table 1: 1 conductor = 53% max, 2 conductors = 31% max, 3+ conductors = 40% max, Nipples = 60% max

Commercial Electrical Circuit Examples

Lighting Circuits:

  • Fluorescent Lighting (20A)
    12 AWG THHN, 3/4" or 1" EMT
  • LED Lighting with Controls (20A)
    12 AWG THHN, 3/4" EMT
  • Outdoor Signage (20-30A)
    12-10 AWG THHN, 3/4" to 1" EMT

Power Distribution:

  • Three-Phase Motors (30-60A)
    10-4 AWG THHN, 1" to 1-1/2" EMT
  • HVAC Units (40-100A)
    8-1 AWG THHN, 1-1/4" to 2" EMT
  • Panelboard Feeders (100-400A)
    1 AWG to 500 kcmil, 2" to 4" EMT

Related Calculators

© 2024 Conduit Fill Calculator. All rights reserved.

Professional electrical conduit fill calculations per NEC standards

© 2024 Conduit Fill Calculator. All rights reserved.

Professional electrical conduit fill calculations per NEC standards